Professional GMAX Testing Services

Ensure player safety and regulatory compliance with professional ASTM F355 GMAX testing. Our certified technicians provide accurate impact testing and detailed reporting for artificial turf fields nationwide.

Why Professional GMAX Testing Matters

Player Safety Assurance

Verify your field meets safety standards to prevent serious injuries from excessive surface hardness.

Regulatory Compliance

Meet ASTM F355 requirements and avoid liability issues with professionally certified testing.

Fast 24-48 Hour Reports

Get detailed test results and recommendations quickly to keep your season on track.

Precise Testing Protocol

Professional-grade calibrated equipment following exact ASTM F355 testing procedures.

Our GMAX Testing Process

1

Site Assessment

Comprehensive field evaluation and testing point identification

2

GMAX Testing

Precise impact testing using calibrated ASTM F355 equipment

3

Data Analysis

Professional analysis of test results against safety standards

4

Detailed Report

Comprehensive report with recommendations and compliance status

Get Professional GMAX Testing Today

Don't risk player safety or compliance violations. Our ASTM F355 certified testing ensures your artificial turf meets all safety requirements with fast, accurate results.

Nationwide Service
24-48 Hour Reports
Emergency Testing Available

Frequently Asked Questions

What is GMAX testing and why is it required?

GMAX testing measures the shock attenuation (impact absorption) of artificial turf surfaces. It's required by safety standards to ensure fields don't become dangerously hard, which can cause serious player injuries. Testing verifies your field meets ASTM F355 requirements.

How often should GMAX testing be performed?

Most facilities require annual GMAX testing for compliance. However, high-use fields or those showing signs of hardening may need testing twice per year. We recommend testing before each season and after any major maintenance.

What GMAX values are considered safe?

ASTM F355 requires GMAX values not to exceed 165 g's for player safety. Values approaching 150+ g's indicate the field is becoming unsafe and requires immediate maintenance attention.

How long does GMAX testing take?

Typical field testing takes 2-4 hours depending on field size and condition. We provide same-day preliminary results and detailed reports within 24-48 hours.

Emergency Field Testing

If you suspect your field has become dangerously hard or have had recent injuries, contact us immediately for emergency GMAX testing. Player safety cannot wait.

Emergency Testing: (555) 123-4567